Contact Us
Open Ticket
WhatsApp
Dedicated Server
Cloud SSD VPS
Forex VPS
Windows VPS
Linux KVM VPS
Linux OpenVZ VPS
cPanel VPS
Minecraft VPS
Web Hosting
Web Hosting
Reseller Hosting
Domain
Sign Up
CX2 Data Center
International TIER-3 Compliant ISO Accredited Data Center
Your Data Is Safe In Our Hands.
World-Class Facility
Anti-Earthquake
Architecture
4 Hours Backup
Power Redundancy
Cold Aisle
Cooling System
24 x 7 CCTV
Surveillance
Fire Detection & Suppression System
24 x 7 Building
Access Control
Carrier-Neutral
Data Center
Close-Up Details Of
CX2 Data Center
Redundancies
Power Stations: Putrajaya and Kapar.
Power Backup: 3 Days Supply, On-Site Diesel Generator.
Network: Multiple upstreams and service providers to ensure constant connectivity.
Data Center & Disaster Recovery: Network connectivity and equipment support.
Cooling System
Cooling: Cold Aisle Containment System
Monitoring System: Temperature & Humidity
Temperature: 18 °C to 24 °C
Humidity: 35% to 65% RH
Security Management
Presence: 24 x 7 security team
Personnel: Proximity card readers
Vehicle: Barrier control
Delivery: Managed by security personnel
CCTV: Multiple CCTV cameras
24 x 7 CCTV Surveillance
24 x 7 Building Access Control
24 x 7 Entrance Security Control
Fire & Safety System
Detection: High sensitivity smoke detectors
Suppression: Water mist system & gas system
Building Management
24×7 security team, CCTV system, proximity card reader & barrier
Temperature & humidity monitoring
M&E operation & power monitoring
Humidity: 35% to 65% RH
Interior of CX2 Data Center
Gallery
Cyberjaya, Malaysia
Location